24 Acres of Steel.
Two Miles from the Port.
100,000 square feet indoor, eight overhead cranes up to 40 tons, three Braner processing lines, BNSF rail spur on-site, and our own truck fleet. Your coil comes off the ship, onto our rail, through our lines, and onto your floor — all from one facility in Carson, California.


Sustainability
Solar-Powered
Since Before It Was Trendy
"If we can save our planet's resources and reduce millions of BTUs of energy and waste, we are doing our jobs better."
— Tony Camasta, President
Solar Power
144 polycrystalline solar panels generating over one-third of our electricity, powering the entire facility.
Clean Air Fleet
New clean-air diesel trucks adhering to the highest emission regulations and standards for environmentally responsible deliveries.
Efficient Lighting
Facility-wide T-5 style fixtures requiring significantly less energy than traditional lighting.
Recycling Programs
Comprehensive recycling initiatives to reduce waste and preserve the planet's valuable resources.
Location
Where the Steel Lands
2 Miles from the Ports
Import coil comes off the ship and into our facility the same day. No one on the West Coast is closer to the action.
BNSF Rail On-Site
Track 1153 at Watson Station. Our own spotting vehicle, indoor and outdoor unloading. Hundreds of cars a month.
Every Freeway in California
We sit at the junction of all major CA freeways. Our fleet delivers anywhere in the Western U.S. with air-ride trailers.
See It For Yourself
Schedule a facility tour or request a quote. Walk our floor, see the equipment run, and meet the team.